The Castlecourt Hotel
Reception relocation and redesign along with Dome Suite renovations and a full toilet remodel
- Property Type
- Hotel & Leisure
- Location
- Westport, Co. Mayo
About the Project
This project involved the erection of temporary hoarding in the main reception and removal/installation of the old/new reception counters. This required the phased closure of the old reception area and the re-design of this area into the general lobby area. The project also involved the full remodel of the hotels main toilets which were re built with new tiling and modern toilet fixtures and fittings.
The Dome Suite bar was removed and replaced with a new bar constructed complete with motorised shutters and integrated lighting along with new modern interior finished throughout. This job was phased over a three week period during the hotels high season and required close planning and team work with hotel management to ensure minimal disruption to the hotel guests and daily operations.